estimations
英 [ˌɛstɪˈmeɪʃənz]
美 [ˌɛstəˈmeɪʃənz]
n. 判断; 评价; 看法; (对水平、数量等的)估计
estimation的复数
柯林斯词典
- N-SING 评价;看法;判断
Yourestimationof a person or situation is the opinion or impression that you have formed about them.- He has gone down considerably in my estimation.
我对他的评价已经一落千丈。 - ...Lee Dixon, the best player on the pitch in his manager's estimation.
教练心目中球场上最好的球员李·狄克逊
- He has gone down considerably in my estimation.
- N-COUNT 估算;估价
Anestimationis an approximate calculation of a quantity or value.- In fact, the first group were absolutely correct in their estimation of this man's height.
事实上,第一组人对这名男子身高的估计完全正确。 - ...estimations of pre-tax profits of £2.25 million.
估计税前利润达225万英镑
- In fact, the first group were absolutely correct in their estimation of this man's height.
双语例句
- Parameter Maximum Likelihood Estimations from Incomplete Data in Generalized Linear Models
不完全数据广义线性模型参数的极大似然估计 - Finally, the estimations of the two-dimensional ( 2-D) transmit-receive central azimuths are obtained by using the property.
最后,利用该特性得到了对目标2维收发中心方位角的估计。 - One of the most important skills in finance is being good at estimations, especially in business.
金融中最重要的技能之一是擅长估计,尤其是商业上的。 - Some Notes on Convergence Rates for Error Variance Estimations in Linear Models
关于线性模型中误差方差估计的收敛速度的若干注记 - Estimations of error for interpolation neural networks in distance spaces
距离空间中插值神经网络的误差估计 - Parameter Estimations of Multi-Dimensional Correlation Coefficient Stationary Series Based on MCMC
基于MCMC的多维相关系数平稳序列 - Prepare detailed written reports that estimate property values, costs, outline methods by which the estimations were made, and meet appraisal standards.
准备详细的书面报告,估计属性值,成本,概述的方法,估算了,并满足评价标准。 - A priori point-wise estimations are established for bounded functions satisfying a new class of nonlinear inequalities involving improper integrals.
对满足一类新的含反常积分非线性不等式的有界函数建立了先验逐点估计。 - Estimations for Two-parametered Exponential Distribution under Censored and Missing Data
截尾缺失数据下双参数指数分布的参数估计 - High variances in the estimations of project parameters are therefore high risks to the project, and early reduction of these variances is important for the project.
因而项目参数估计中的高方差对项目来说是高风险的,尽早减少这些方差对项目来说是重要的。